Dec 22, 2014

[WATCH]: Mission RS: The Electric Superbike of the Future

Green Tech
Admin
1 min
If you haven't been paying attention, electric vehicles have become amazingly cool over the past several years. One aspect of the industry still...

If you haven't been paying attention, electric vehicles have become amazingly cool over the past several years. One aspect of the industry still emerging is electric motorcycles. While electric cars may be commonplace, motorcycles are less so. However, Mission Motorcycles is out to make you never forget about them again. The Mission RS is an engineering marvel—and just plain cool. In this documentary from Motherboard, take an up close and personal look at the future of the motorcycle industry. 

Share article

Apr 23, 2021

Drax advances biomass strategy with Pinnacle acquisition

Drax
Biomass
Sustainability
BECCS
Dominic Ellis
2 min
Drax is advancing biomass following Pinnacle acquisition it reported in a trading update

Drax' recently completed acquisition of Pinnacle more than doubles its sustainable biomass production capacity and significantly reduces its cost of production, it reported in a trading update.

The Group’s enlarged supply chain will have access to 4.9 million tonnes of operational capacity from 2022. Of this total, 2.9 million tonnes are available for Drax’s self-supply requirements in 2022, which will rise to 3.4 million tonnes in 2027.

The £424 million acquisition of the Canadian biomass pellet producer supports Drax' ambition to be carbon negative by 2030, using bioenergy with carbon capture and storage (BECCS) and will make a "significant contribution" in the UK cutting emissions by 78% by 2035 (click here).

Drax CEO Will Gardiner said its Q1 performance had been "robust", supported by the sale of Drax Generation Enterprise, which holds four CCGT power stations, to VPI Generation.

This summer Drax will undertake maintenance on its CfD(2) biomass unit, including a high-pressure turbine upgrade to reduce maintenance costs and improve thermal efficiency, contributing to lower generation costs for Drax Power Station.

In March, Drax secured Capacity Market agreements for its hydro and pumped storage assets worth around £10 million for delivery October 2024-September 2025.

The limitations on BECCS are not technology but supply, with every gigatonne of CO2 stored per year requiring approximately 30-40 million hectares of BECCS feedstock, according to the Global CCS Institute. Nonetheless, BECCS should be seen as an essential complement to the required, wide-scale deployment of CCS to meet climate change targets, it concludes.

Share article