What is Siemens Gamesa's Impact on Global Wind Energy?

Wind power is being used in more than half of all the countries in the world, generated by hundreds of thousands of turbines.
Approximately 1,100 GW of wind power capacity is installed worldwide, and 130 GW of this is from Siemens Gamesa turbines alone.
This includes high-profile projects such as ScottishPowerâs East Anglia TWO, where Siemens Gamesa received a contract worth more than ÂŁ1bn (US$1.3bn) to supply 64 turbines in the UK.
UK Prime Minister Keir Starmer said: âOur mission to make Britain a clean energy superpower will fire up our industrial heartlands and break down barriers to growth in our hard-working towns and cities.
âIt will strengthen our national security -âŻprotecting our children and grandchildren from the climate crisis, and impact this will have on their future prosperity.
âBy acting decisively and early, the UK has an opportunity to lead the world in the industries of the future â working in partnership with businesses like ScottishPower and Siemens Energy â creating real energy security, cutting energy bills and building jobs and supply chains in the UK.â
A brief history of Siemens Gamesa
Gamesa and Bonus Energy were founded in 1976 and 1980 respectively.
The first Bonus Energy turbine, delivering 22 kW, started its operation in 1981 and continued to run through 2016.
The worldâs first offshore wind farm was built with 11 Bonus Energy 450 kW turbines in 1991 which continued to operate for 25 years.
Gamesa entered the wind energy sector in 1994 and installed its first wind farm in 1995.
Siemens acquired Bonus Energy in 2004 which became Siemens Wind Power.
Siemens Wind Power and Gamesa concluded the merger of their wind power businesses in 2017, creating Siemens Gamesa.
Today, the business is a unit of Siemens Energy and is led by CEO Vinod Philip.
Siemens Gamesa today
Siemens Gamesa today is a testament to decades of dedication and expertise in wind power.
With decades of experience under its belt, Siemens Gamesa is now a team of more than 28,000 individuals over 100 nationalities.
It holds a dominant position in onshore wind power in the Americas, Europe, Africa and Asia.
It stands as a global leader in offshore wind, tapping into the strong winds at sea to advance sustainability.
It doesnât just provide turbines, but also services them.
Wind turbines will have to endure more than 120,000 operating hours over their lifetime and can be found in remote locations.
Siemens Gamesaâs services business leads the industry in operating, maintaining and optimising turbines to ensure they generate power for as long as possible.
Where Siemens Gamesa turbines are made
Siemens Gamesa has production facilities around the world, including in:
- Brande, Denmark along with R&D
- Fort Madison, Iowa, US
- Aalborg, Denmark
- Linggang, China
- Hull, UK
- Ain Soukhna, Egypt
The business has more than 6,000 employees in the UK, 1,300 of which work in its Hull blade factory.
Siemens Gamesa blades are used in wind farms across the UK, including in ScottishRenewablesâ East Anglia wind farms, RWEâs Sofia wind farm and Ărstedâs Hornsea wind farms.
Darren Davidson, UK and Ireland Vice President for Siemens Energy and Siemens Gamesa, said: âThe UK is the first leading industrial country to simultaneously phase out coal power and be a leader in offshore wind.
“If we’re to achieve our net zero targets, it’s mission critical this momentum is maintained.
“As well as delivering the blades to power the UK’s energy transition, our factory in Hull is acting as a catalyst for economic growth and green jobs across the region.”
Explore the latest edition of Energy Digital Magazine and be part of the conversation at our global conference series, Sustainability LIVE.
Discover all our upcoming events and secure your tickets today.
Energy Digital is a BizClik brand


